Hangzhou EPG Co.,Ltd. , was launched in November, 1997. With its five wholly owned subsidiaries. We can offer a full-selection of electricity transmission merchandise like chains, sprockets and plate wheels, pulleys, gearboxes, motors, couplings, gears and racks. we are self-assured to provide our buyers flexible and diversified providers.
Capability for cnc machining:
CNC Turning | phi0.five – phi300 * 750 mm | /-.005 mm |
CNC Milling | 510 * 1571 * 500 mm(max) | /-.01 mm |
CNC Stamping | 1000 * a thousand mm(max) | /-.05 mm |
Drawing Format | IGS,STP,X_T ,DXF,DWG , Pro/E, PDF | |
Check EPT | measurement instrument, Projector, CMM, Altimeter, EPTmeter, Thread Gages, Calipers, Pin Gauge and so on. |
EPT Offered :
Stainless Metal | SS201,SS301, SS303, SS304, SS316, SS416 etc. |
Metal | mild steel, EPTT steel, 4140, 4340, Q235, Q345B, twenty#, forty five# and so forth. |
Brass | HPb63, HPb62, HPb61, HPb59, H59, H68, H80, H90 and many others. |
Copper | C11000,C12000,C12000 C36000 and many others. |
EPTT | AL6061, Al6063, AL6082, AL7075, AL5052, A380 etc. |
Iron | A36, forty five#, 1213, 12L14, 1215 and so on. |
Plastic | Abs, Personal computer, PE, POM, Delrin, Nylon, Teflon, PP,PEI, Peek and so on. |
Floor finish:
EPTT parts | Stainless Steel elements | Metal | Plastic |
Very clear Anodized | PoEPTTng | Zinc plating | Portray |
EPTT Anodized | Passivating | OXiHu (West EPT) Dis.de black | Chrome plating |
Sandblast Anodized | Sandblasting | Nickel plating | poEPTTng |
EPTT Movie | Laser engraving | Chrome plating | Sandblast |
Brushing | Carburized | Laser engraving | |
PoEPTTng | Warmth therapy | ||
Chroming | PowEPTTCoated |
EPT Show
Productes gear
FAQ
Q: Are you trading company or maker ?
A: We are manufacturing facility.
Q: How EPTT is your shipping time?
A: EPTTly it is 5-10 daEPTTif the merchandise are in inventory. or it is fifteen-20 daEPTTif the products are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or added ?
A: Yes, we could supply the sample for free charge but do not pay out the EPT of freight.
Q: What is your conditions of payment ?
A: Payment 30%TT in EPT. 70% T/T before shippment